
Chilled mirror or capacitive: dew-point sensors for dry rooms
A capacitive dew-point sensor at a typical ±2 °C can read −58 °C in a room at −60 °C, and it drifts most after wet air gets in. A chilled mirror, typically around ±0.2 °C, makes a good reference. Keep every comparison and set each sensor's calibration interval from its own drift.
InsightRead




