Skip to content

Maintenance Service

Chilled mirror or capacitive: dew-point sensors for dry rooms

  • Maintenance Service
  • 1 min read

A capacitive dew-point sensor with a typical ±2 °C accuracy can read −58 °C while the dry room sits at −60 °C.

The dehumidifier then works to correct a number that was never real.

Aluminium oxide and polymer elements are fast, and cheap enough to fit at every point that matters, which is why they run most control loops. They drift, and they drift most after contact with wet air. In a dry room that means a maintenance shutdown or a dehumidifier trip, exactly the events after which you most need the reading to be right.

A chilled mirror measures dew point directly: it cools a small mirror until frost forms and reads the mirror's temperature. Reference instruments are typically specified to around ±0.2 °C. They respond slowly at very low dew points and the mirror has to be kept clean, so few sites use one for control.

A common arrangement pairs the two, with capacitive sensors on control and alarms and a chilled mirror, fixed or portable, used to check them. The records are the useful part. After a year of comparisons, each sensor's calibration interval can come from its own drift, and the ones that go off after every shutdown stand out.

Periodic calibration is part of Humiley's maintenance service, and we build dry rooms to −60 °C dew point and below.

After your last dehumidifier trip, did anyone check the dew-point sensors before trusting them again?

Related

More on this subject

45% or 30% RH: what the dew point decides

At 20 °C, 45% RH is about a 7.7 °C dew point, within reach of a cooling coil on roughly 5 °C chilled water; 30% RH is about 1.9 °C and points to desiccant dehumidification. EU GMP gives no RH value, so derive the limit from product moisture data and exposure time before sizing plant.

InsightRead