Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

137 articles tagged #Cleanroom.

Performance Beyond the Surface

Cleanroom surfaces look like a finishing trade and behave like a performance system. Wall, floor and ceiling finishes decide whether a room can be cleaned to its classification, how long it survives a sporicidal regime, and how much particulate it sheds back into the air it was built to keep clean.

InsightRead

Data Integrity

You can have a flawless Grade A cleanroom and the most advanced equipment—but if your operational data (temperature, humidity, differential pressure, batch mixing parameters, etc.) does not comply with ALCOA+ principles (Accurate,…

InsightRead

Central Vacuum Cleaning

In GMP audits, scrutiny often lands on Cleaning Procedures. Using portable vacuum cleaners in cleanrooms is a red flag. Why? Because the exhaust turbulence from a portable unit disrupts laminar airflow and can aerosolize settled dust,…

InsightRead