Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Life Sciences

Life Sciences

56 articles tagged #Maintenance.

Decommissioning a room or HVAC system under change control

A room taken out of use without paperwork keeps alarming and keeps printing maintenance tasks. Treat it as a change: assess the neighbouring pressures, archive the final records and monitoring data, isolate utilities and cap ducts, update the asset register, maintenance plan and calibration schedule, and formally retire the monitoring points.

InsightRead

Engineering Solution & Consultancy

HVAC – The Heart of Cleanrooms

A cleanroom can meet its classification on paper, yet fail GMP expectations if HVAC performance is unstable or poorly aligned with operational reality. Cleanroom performance is often discussed in terms of ISO classes or GMP grades.

InsightRead

Engineering Solution & Consultancy

Protecting Operational Integrity

In industrial buildings, waterproofing is often underestimated until a failure occurs. Water ingress is not just a maintenance headache; it can permanently damage precision equipment, disrupt GMP-sensitive operations, and degrade…

InsightRead

Central Vacuum Cleaning

In GMP audits, scrutiny often lands on Cleaning Procedures. Using portable vacuum cleaners in cleanrooms is a red flag. Why? Because the exhaust turbulence from a portable unit disrupts laminar airflow and can aerosolize settled dust,…

InsightRead