A 20-second excursion can fall between two 1-minute log entries, and a change-of-value deadband can store a slow drift as a flat line. Set the logging interval shorter than the shortest event that matters and the deadband smaller than the smallest drift, and evaluate alarms in the controller.
When the BMS, EMS and particle counters keep different times, an excursion cannot be reconstructed. Sync every system to one NTP source with a backup and an alarm, store data in UTC, and prove in OQ that every clock reads within ±2 seconds of the reference, then repeat it at periodic review.
A particle counter on UPS can stay powered through a power dip and count nothing if its vacuum pump sits on the normal supply. Network switches in risers, transmitters on AHU field panels and unsynchronised clocks leave the same kind of gap. Trace the supply of every item between the sensor and the historian.
Under NAMUR NE 43, a 4–20 mA loop is valid between 3.8 and 20.5 mA; 3.6 mA or below, or 21 mA or above, signals a fault. Configure the EMS to show those as bad quality and alarm, never the last good value, and detect stale values on digital links too.
Environmental monitoring and BMS data that support GMP decisions must meet ALCOA+. In practice that means individual logins, time-synchronized controllers, an audit trail users cannot disable, alarms acknowledged with name and comment, and tested backups, with GMP-critical parameters separated early onto a validated system.