Skip to content

News

What the EMS never saw: logging interval vs deadband

  • News
  • 1 min read

A pressure excursion that lasts 20 seconds can happen entirely between two 1-minute log entries. The EMS record shows a clean line.

Two settings decide what an environmental monitoring or BMS historian keeps, and they fail in opposite directions.

The logging interval samples at fixed times. Anything shorter than the interval may fall between samples: a door held open, a fan restart, a brief loss of cascade during a filter change. The trend looks stable because it never saw the event.

A change-of-value deadband logs only when the value moves by more than a set amount. It catches sudden steps, but a slow drift that stays inside the band for hours is stored as a flat line. A room creeping down from 15 Pa toward its alarm limit can look unchanged until it crosses.

So start from the process, not the historian's defaults. Decide the shortest event that matters for this room and the smallest drift that must be visible. Set the interval shorter than the event and the deadband smaller than the drift. And have alarms evaluated in the controller at full speed, not from the logged data.

ALCOA+ asks for records that are complete and accurate. A record that could never contain the event fails that test, however tidy the trend looks.

When we write a URS for monitoring, both settings come with the reason written next to them.

Related

More on this subject

ALCOA+ on a paper pressure log

A paper room-pressure log with every reading in the same pen at the end of the shift fails ALCOA+ before any number is checked. Walking one sheet against the nine attributes, from attributable initials to enduring ink, shows that most data-integrity failures are fixed by redesigning the form.

InsightRead

GAMP 5 Second Edition puts critical thinking first

GAMP 5 Second Edition (2022) scales validation effort to risk to patient safety, product quality and data integrity, and adds agile and cloud guidance. On a GMP BMS, test alarms, audit trail and data transfer deeply. A quick check: count low-risk functions that still carry full test scripts.

InsightRead

ALCOA+ on the EMS is a design requirement

Environmental monitoring and BMS data that support GMP decisions must meet ALCOA+. In practice that means individual logins, time-synchronized controllers, an audit trail users cannot disable, alarms acknowledged with name and comment, and tested backups, with GMP-critical parameters separated early onto a validated system.

Read