In front of every live switchboard there is a distance at which an arc flash would deliver 1.2 cal/cm² to bare skin.
NFPA 70E calls it the arc flash boundary. 1.2 cal/cm², about 5 J/cm², is the incident energy at which a second-degree burn on unprotected skin becomes likely.
Voltage alone does not set the boundary. It is calculated board by board, usually with IEEE 1584, from the fault current at that board and the time the upstream protective device takes to clear the arc.
The second input is where the surprises come from. A distribution board at the end of a long cable has a lower fault current than the main switchboard. Its arcing current may fall below the instantaneous pickup of the upstream breaker, which then trips on its time-delay curve, and the arc burns many times longer. The small board in the plant room can end up with a wider boundary than the main switchboard.
NFPA 70E is a US standard, and local regulations decide what is mandatory on a site in Viet Nam.
The distance on the label holds only for the protection settings it was calculated with. Change a breaker setting, a transformer or a feeder cable, and it needs recalculating.

