Skip to content

News

Why an alarm should sit inside the specification limit

  • News
  • 1 min read

With the action alarm at 60% RH on a room whose limit is 60% RH, there is no margin left for the sensor.

The humidity sensor behind the alarm has a calibration certificate with an expanded uncertainty, say ±2% RH. When the display reaches 60%, the true value could be 62%.

Calibration laboratories have a tool for this. A guard band moves the acceptance limit inside the specification limit by a margin tied to the measurement uncertainty. ILAC-G8:09/2019, reissued unchanged in 2026 as Global ACI-TECH-1-002 (G), notes that a guard band equal to the expanded uncertainty is common, and that for a one-sided limit it keeps the probability of a false accept below 2.5%.

Carried over to the room, the action alarm goes to 58%: the limit less the uncertainty. An alert comes before it, at 55% for instance, early enough to find the open door while the room is still inside its specification.

The price is operating room. If the room normally sits between 50 and 56%, an alert at 55% rings every wet afternoon and is ignored within a month. Then the choices are a better sensor, tighter control, or a limit that the product data can justify moving. Thinning the guard band until the alarms stop is none of these.

Write the reasoning down beside the calibration data it rests on. When the sensor is replaced by one with a different uncertainty, the alarm values are reviewed with it.

Related

More on this subject