At −60 °C dew point and 20 °C, the relative humidity in a battery dry room is about 0.05%.
The saturation vapour pressure over ice at −60 °C is about 1.1 Pa. At 20 °C the air could hold about 2,340 Pa. RH is the ratio of the two, and here it is a very small number.
Let the room drift from −60 °C to −40 °C dew point. The air now carries roughly twelve times as much water, the kind of change a lithium-ion line notices in its product. The RH moves from about 0.05% to about 0.55%. A general-purpose RH sensor with an accuracy of ±1 to ±2% RH cannot tell those two rooms apart.
A dew point transmitter built for trace moisture sees the same drift as a 20 K rise. Alarms set on dew point fire on a moisture change, and acceptance criteria written in dew point can be tested and trended with an instrument that actually resolves them.
RH still has its place in the same plant. Humiley's desiccant dehumidification controls production areas to ±2% RH, where an RH sensor is the right instrument, and we design dry rooms to −60 °C dew point and below, where it is not.
For engineers who moved from pharma into battery work: which instrument habit took longest to drop?
Industries