Every dry-room operator adds about 200 g of water an hour

  • Renewable Energy
  • 1 min read

One operator at light bench work puts about 200 g of water an hour into the air. A dry room at −60 °C dew point has none to spare.

The figure comes from ASHRAE's table of heat gain from occupants: roughly 140 W of latent heat per person for light bench work in a factory, which is about 200 g of water vapour an hour. Air at −60 °C dew point holds under 0.01 g of water per kg. Ten operators add around 2 kg of water an hour, and the dehumidifier has to remove every gram of it, on top of what leaks in at the doors and through the envelope.

Gowning and the airlock cut what reaches the room air. How much depends on the suits, the hoods and how long people stay inside, so agree that number with production and put it in the design basis.

The sizing figure is the most people in the room at once. Shift changeover is where it hides, with two crews overlapping for the handover. A room qualified during a quiet ramp-up can start drifting every afternoon once full production brings the extra operators in.

Our dehumidification units are engineered from the project's own load calculation, which is only as good as the headcount written into it. We design dry rooms to −60 °C dew point and below.