An opened encapsulant roll left on the layup table through a wet afternoon can pick up enough moisture to show as voids in the laminate.
Most of a module line only needs temperature control. Stringing, layup and lamination are where glass, encapsulant, cells and backsheet are stacked and sealed, and anything in the stack stays there for the life of the module. A particle under the film is a permanent defect. Moisture carried in by the film can come out in the laminator as bubbles, and years later as delamination or corrosion at the cell ribbons.
The film supplier's datasheet gives handling conditions, usually with a time limit once a roll is opened. Treat those as the design input. Write them into the URS for the layup zone as a temperature, an RH and a dew point, and ask the design to show the room holding them on the most humid afternoon of the rainy season.
On a running line, log RH at the layup table itself, not at the return grille, for a week of the rainy season, and set it against the supplier's limit. A hall can meet it in the morning and lose it by late afternoon, when the fresh air carries the day's peak dew point.
A zone from stringing to lamination with its own air handling, slightly positive to the hall, usually costs less than drying the whole building.
Humiley designs PV module plants for the climate they are built in.
Does anyone on your line know how long an opened roll may sit on the table?
Industries



