99.975% is the H14 figure most filter submittals leave out: the limit at every single point on the face.
EN 1822-1 gives each H class two numbers. Integral efficiency is the average over the whole filter at MPPS: 99.995% for H14, 99.95% for H13. Local efficiency applies to any single point on the face: 99.975% for H14, 99.75% for H13.
Written as penetration, the gap is easier to see. An H14 may pass 0.005% on average, but no spot may pass more than 0.025%, which is 5 times the average. A pinhole in the media or a poor bond at the potting can hide inside a good average and still break the local limit.
That is why filters from H13 upwards are tested one by one at the factory, and why EN 1822-4 describes a scan across the whole face rather than a single reading. Each filter should arrive with its own test report and serial number.
The factory scan covers the filter only. It says nothing about the gasket, the housing or the frame seal, which is what the installed leak test on site is for.
When we review a filter submittal, we look for the local value and the individual report, not only the class printed on the label. A box marked H14 with no test record for that serial number goes back.

