Temperature mapping protocols written abroad ask for a summer study and a winter study. In southern Viet Nam, there is no winter to map.
WHO guidance on mapping storage areas asks for mapping under the seasonal extremes the site actually sees. In the south that means two very different stresses: the hot dry months before the rains, and the humid rainy season.
The dry season tests temperature. Afternoon peaks, sun on the roof and west walls, the top of tall racking closest to the ceiling. The hot spots are high and on the sunny side, and the cooling plant runs near its limit in the afternoon.
The rainy season tests moisture and cooling load in a different way. Outdoor dew points stay high day and night, the cooling coils carry a large latent load, and dock doors let in humid air that condenses on cold surfaces. If any product label carries a humidity limit, this is the season that proves the warehouse can hold it.
A single mapping in the wrong season can pass comfortably and prove little. Two mappings, timed to the local calendar, give a record an inspector can follow. For a 15–25 °C store in this climate, it also shows whether the HVAC was sized for the wet months or only the hot ones.
To plan a mapping or check a warehouse HVAC design, talk to an engineer: contact@humiley.com or +84 28 7777 6668 (Viet Nam office).




