A chilled-water valve with 10 kPa across it, on a coil branch that loses 40 kPa, has an authority of 0.2, and at part load it will hunt.
Authority is the valve's share of the pressure drop in the circuit it controls: valve drop divided by valve drop plus the coil, pipes and fittings in series with it. Here that is 10 / (10 + 40) = 0.2.
With low authority, the valve does nearly everything in the first part of its stroke and little over the rest. An oversized valve makes it worse: it spends the whole shift barely off its seat. There, a 2% change in position is a large change in flow. The PID loop overshoots, the coil leaving temperature swings, and on a cleanroom AHU the dew point swings with it. At full load on a wet afternoon nobody notices. At night, or in the dry season, the trend looks like a saw blade.
The check fits on the schematic, before any valve is ordered. Take the design pressure drop of the coil and its branch, choose the valve so its own drop at design flow is about equal, and the authority comes out close to 0.5. Then look at the lowest load the coil will see and make sure the valve is not sitting below 10 to 20% open there. If it is, a smaller valve or two valves in parallel costs less than a year of hunting.
AeroSano AHUs are engineered from the project's own load calculation, so the lowest load is known when the valve is chosen.




