Skip to content

Manufacturing & Distribution

The drive-to-motor cable behind jittery pressure readings

  • Manufacturing & Distribution
  • 1 min read

Room pressure readings jitter whenever the supply fan changes speed, and a transmitter near the drive has failed twice.

Both symptoms point at the same 40 metres of cable between the drive and the motor.

A variable speed drive builds its output from fast voltage pulses. On an ordinary unscreened power cable those edges radiate, and they couple into whatever runs alongside: the 4–20 mA loop from the pressure transmitter and the sensor cables. The high-frequency current also has to return to the drive, and without a low-impedance path it goes through the earth system and sometimes the motor bearings.

The fix is in every drive manual, and it is value-engineered out of many installations.

Use screened, symmetrical motor cable. Bond the screen through 360 degrees at both ends, with EMC glands or clamps at the drive and at the motor terminal box. A screen twisted into a pigtail does little at these frequencies.

Keep the motor cable out of the signal tray. The manual gives the separation, and crossings should be at right angles.

Check the length. Each drive has a maximum motor cable length. Beyond it the reflected pulses raise the peak voltage at the motor terminals, and the manual will ask for an output filter.

The control panels and MCCs we supply are built to IEC 61439. The motor cable is field wiring, so it belongs in the installation specification.