With the fan stopped, an AHU electric heater has nowhere to send its heat.
The elements keep drawing full power, and within minutes the filter bank and the sensors downstream sit in radiant heat. What makes a heater section safe is the chain around it, and each link can be witnessed at the factory test with the section live:
- Stop the fan with the heater on. The heater drops out on the airflow switch. A fan run signal is no proof of air, since a belt can break with the motor still turning.
- Trip each high-limit cut-out. There are two: an automatic-reset one that cycles the heater, and a manual-reset one set higher that opens the power circuit directly, with no software in the path.
- Switch the heater off and time the fan. It runs on to carry the stored heat away, for the period the heater manufacturer gives.
- Measure the distance from the elements to the filters and to the temperature sensor, and compare it with the installation instructions. A sensor that sees the elements reads radiation as well as air.
- Ask what happens when the switching device fails. A solid-state relay usually fails conducting, so a contactor upstream, opened by the limits and the airflow interlock, has to be able to cut the power.
On a variable-volume unit there is one more question: the heater's minimum air velocity at the lowest fan speed.



