A fan built for a 60 Hz supply turns at 83% of its speed when it is connected direct on line to 50 Hz.
Motor speed follows supply frequency, and 50/60 is 0.83. Airflow falls with speed, to 83%; pressure goes with the square, to about 69%, and shaft power with the cube, to about 58%.
So a packaged unit designed and tested in a 60 Hz country arrives in Viet Nam, where the grid is 50 Hz, and delivers five sixths of its airflow into a duct system sized for all of it. Centrifugal pumps follow the same laws.
The motor needs a second look. Its flux depends on the ratio of volts to hertz. A 460 V, 60 Hz winding suits 380 V at 50 Hz, since both come to between 7.6 and 7.7 V/Hz, and then gives about five sixths of its rated power. The same winding on 460 V at 50 Hz would be over-fluxed and run hot.
There are fixes. A belt drive can be re-pulleyed if the motor has the margin, and a variable speed drive can run the motor above 50 Hz if the supply voltage covers what the motor needs at that frequency.
Before ordering equipment built for another market, look for a 50 Hz rating on the nameplate drawing and for performance data at that frequency.

