Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

17 articles tagged #BIM3DDesign.

Walk-on ceilings: service the plant from above

A walk-on cleanroom ceiling turns the void into a service floor, so dampers, sensors, cables and lighting are maintained without entering the room. It only helps filter changes if the HEPA housings are top-serviceable, and the void must be designed as a floor. Worth it for plant-heavy suites, rarely for small labs.

InsightRead

5% duct leakage into a hot void costs 3.4 kW

When 5% of a 10,000 m³/h, 12 °C supply leaks into a 32 °C ceiling void, about 3.4 kW of sensible cooling goes with it and the room is 500 m³/h short. A named airtightness class, a pressure test before insulation and sealed joints and access doors keep that cooling in the duct.

InsightRead