Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

47 articles tagged #ContaminationControl.

Zoning and Pressure Cascade

In pharmaceutical facility design, if the HVAC system is the "lungs," then the Zoning and Pressure Cascade strategy is the "immune system." It creates invisible but effective barriers that prevent microbial ingress and strictly control…

InsightRead

Performance Beyond the Surface

Cleanroom surfaces look like a finishing trade and behave like a performance system. Wall, floor and ceiling finishes decide whether a room can be cleaned to its classification, how long it survives a sporicidal regime, and how much particulate it sheds back into the air it was built to keep clean.

InsightRead

In the past, contamination control was often managed in silos: HVAC handled ventilation, Architecture handled walls/ceilings/floors, and QA handled cleaning procedures. But under the updated EU GMP Annex 1, that approach is no longer…

InsightRead