Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Life Sciences

Life Sciences

65 articles tagged #AirHandlingUnits.

What plant steam brings into the supply air

A humidifier fed from the plant boiler injects the boiler's volatile treatment chemicals into the supply air. WHO's HVAC guideline for non-sterile products says chemicals that could have a detrimental effect on the product should not be added to the boiler system. Use a clean steam generator or a steam-to-steam humidifier, or assess every chemical, and state the steam quality in the URS.

InsightRead

A single AHU replacement in a live GMP plant carries every constraint of a large project: a short shutdown window, existing connections, a pressure cascade to re-prove and change control before fabrication or any site work starts. Planned well, requalification stays short. Planned badly, a weekend job becomes a two-week deviation.

Read

Zoning and Pressure Cascade

In pharmaceutical facility design, if the HVAC system is the "lungs," then the Zoning and Pressure Cascade strategy is the "immune system." It creates invisible but effective barriers that prevent microbial ingress and strictly control…

InsightRead

In the past, contamination control was often managed in silos: HVAC handled ventilation, Architecture handled walls/ceilings/floors, and QA handled cleaning procedures. But under the updated EU GMP Annex 1, that approach is no longer…

InsightRead