Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

4 articles tagged #ISO9001.

Calibration dates and the commissioning program

A calibration certificate that expires partway through air balancing leaves the later readings without a traceable instrument at OQ review. Before commissioning, list every instrument that will produce a qualification reading, check each due date against the whole test window plus slippage, and record the serial on every test sheet.

InsightRead

Closing an NCR takes more than 'rectified'

An NCR marked 'rectified' has recorded a repair. To close it properly, state the requirement that was broken, contain the item, decide the disposition and name who decided, find the cause and check for the same fault elsewhere, then verify against the original requirement and attach the evidence.

InsightRead