Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Maintenance Service

Maintenance Service

3 articles tagged #ISO14644.

Installing terminal HEPA filters: the sequence

A terminal HEPA filter passes its factory test and is then carried through a building site. Clean the room and run on pre-filters first, unpack at the point of use, check the label against the position schedule, tighten evenly, then leak-scan the installed filter to ISO 14644-3 and record the serial number against its position.

InsightRead

What ends the life of a HEPA filter

EU GMP Annex 1 (2022) asks for an integrity test of final filters at requalification and puts no age on the filter. A terminal HEPA is replaced when a leak cannot be repaired within site limits, when pressure drop reaches the manufacturer's final value, or after damage or wetting. On glass-fibre media, dust loading alone does not lower efficiency.

InsightRead

Replacing one failed terminal HEPA in a live Grade C suite starts with change control and an equivalent filter. Stop work, bag the old filter, inspect the housing, then fit and leak-scan the new filter in place. Clean and check airflow, pressures, counts and recovery before release, with the scope agreed in the change record.

InsightRead