Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

3 articles tagged #Biotechnology.

Cell culture suites: the process sets the grade

In cell and gene therapy, an open step needs Grade A air, usually in a Grade B background with the gowning and air volumes that come with it. A proven closed process can justify a lower background grade. Map every step that opens the product before fixing room grades and HVAC size.

InsightRead