For a biotech product, one section of the dossier describes rooms, flows and equipment.
It is the appendix on facilities and equipment, section 3.2.A.1 of ICH M4Q(R1), and under the heading "Biotech" it asks for things a facility engineer normally keeps on the drawing board.
A diagram should be provided illustrating the manufacturing flow, including the movement of raw materials, personnel, waste and intermediates. Information should be presented on adjacent areas or rooms that may be of concern for maintaining the integrity of the product, and on all developmental or approved products manufactured or manipulated in the same areas.
For equipment, the section says a summary description of product-contact equipment and its use, dedicated or multi-use, should be provided. Information should also be included on procedures, such as cleaning and production scheduling, and on design features of the facility, such as area classifications, to prevent contamination or cross-contamination.
Read that list beside a layout. The flow diagram is the personnel, material and waste flow drawing, and the adjacent areas come off the zoning plan and the pressure cascade. Dedicated or multi-use was decided at URS stage. Each is settled early in design and later becomes a statement to a regulator, so the dossier writer needs the drawings at the revision that was built.
Industries