If a floor drain in the plant room backs up, a condensate line piped straight into it can carry that water back toward the AHU.
The trap under the drain pan is there to stop air moving through the drain line while the fan runs. It was never meant to hold back the building's drainage. So the condensate should leave the unit, pass through its own trap, and then fall through open air into a tundish or a trapped gully, with a visible gap between the pipe end and the water below.
That gap does three jobs.
- Nothing in the building drain can flow or siphon back into the unit, because the pipe ends in air.
- Sewer gas cannot reach a trap that has dried out during a long shutdown and be drawn into the supply air.
- Anyone walking past can see condensate running while the coil dehumidifies. No drip on a wet afternoon points to a blocked or air-locked trap before the pan overflows.
Where several AHUs share one drain, each needs its own trap and its own break before the lines join. A unit under positive pressure on a common line can push air into its neighbour's drain.
The size of the gap and the gully trap come from the local plumbing code, so write the requirement into the mechanical specification instead of leaving it to the installer on the day.
AeroSano units are FAT-tested and witnessed before they ship, which is a good moment to check where the drain connection sits.