Skip to content

Life Sciences

Ducted HEPA or FFUs for Grade B and C rooms

  • Life Sciences
  • 1 min read

Forty fan filter units over one Grade C room give you forty speed settings, and the room total is right only while every one of them holds.

The alternative is ducted terminal HEPA fed from one AHU. Both can reach the grade. We would weigh airflow control first.

In a ducted system one fan speed and a few dampers at the AHU hold the total supply. An FFU ceiling has no single point that sets the total; each unit is its own supply. Group control of EC motors helps, but the balance is still checked at each requalification.

On energy, the fan-heat argument is weak. The heat reaches the air either way: an FFU releases it in the plenum, and the fan in a draw-through AHU adds it just after the coil. What differs is fan efficiency and pressure drop. Small FFU motors are usually less efficient than one large AHU fan, but FFUs skip the duct and terminal losses. Which uses less depends on the layout, so calculate it. Retrofits without duct space often favour FFUs.

One failed FFU leaves one zone short of supply. An AHU fan stopping takes out the whole area unless the fans sit in a fan wall with redundancy. An FFU ceiling still depends on a make-up AHU for fresh air, cooling and dehumidification, and if that unit stops the room loses pressurisation too.

Humiley supplies both, built by qualified manufacturing partners under our engineering control, each unit FAT-tested.

Industries

Related

More on this subject

EN 1886 class L2 allows an AHU casing 0.44 l/s per m² of leakage at −400 Pa. On a witnessed FAT, casing leakage, fan airflow at design static pressure, filter bypass and the control panel are checked against the approved specification, and both engineers sign the sheet that goes into the equipment file.

InsightRead

Manufacturing & Distribution

Where the steam humidifier sits in the AHU

Steam that has not absorbed before it meets a filter, fan or sensor leaves them wet. Take the absorption distance from the maker at the unit's real air speed and load, keep wet-sensitive parts beyond it, fit a trapped stainless drain pan and access, and add a downstream high-limit sensor.

InsightRead