At equal thickness, a polyurethane-core AHU panel insulates better than a mineral wool one. Mineral wool is the one that does not burn.
Thickness is only part of the choice.
Polyurethane foam has a lower thermal conductivity than mineral wool, so a 50 mm PU panel can match or beat a 60 mm mineral wool panel on heat loss. It is light and stiff. It is also combustible. Its reaction-to-fire class depends on the formulation and the skins, and fire authorities and insurers often will not accept it in a plant room or beside an escape route.
Mineral wool is non-combustible and absorbs some fan noise. It needs more thickness for the same heat loss, weighs more, and needs sealed cut edges so fibres stay inside the skins.
In a tropical plant room the thermal question is mostly condensation. A casing carrying 12 °C air after the cooling coil, in a room at a 26 °C dew point, sweats first where the frame bridges the two skins, whatever the core. EN 1886 rates that as the thermal bridging factor, the TB class, and the frame and profile design decide it more than the core does.
The order we would decide in: fire class first, from the local code and the insurer. Then the TB class the plant room humidity calls for. Thickness last.