A room-pressure log with every reading in the same pen and the same neat column was probably filled in at 17:55.
That sheet fails ALCOA+ before anyone checks a number. Paper pressure logs look too simple to need a design, which is why they break first.
Walk one sheet against the nine attributes. Attributable: initials that map to a signature list, not "NV" for three people called Nguyen. Legible: a 3 overwritten into an 8 is neither legible nor accurate; a single line through, the new value, initials and date would have been. Contemporaneous: each reading needs its own time, written when it was taken. Original: readings copied from a scrap of paper or a phone photo make the sheet a transcript. Accurate: the gauge ID and its calibration due date belong on the sheet, or nobody can tell which instrument produced the reading.
The "plus" attributes catch the rest. Complete: a missed reading is recorded as missed, with a reason, never left blank. Consistent: same units and time format on every line, entries in sequence. Enduring: no pencil, and no thermal printer slips that fade within a year. Available: the sheets can be found and read for the whole retention period.
Most of these failures are fixed by redesigning the form rather than retraining the people. An EMS to 21 CFR Part 11 closes more of them, and we design those too, but a well-designed paper sheet is a legitimate choice.
Industries