A PIC/S member inspector asks how QC audit trails are reviewed, and the site's SOP answers by citing the FDA Q&A.
Nothing in that SOP is wrong. The inspector will still read it against PI 041-1, the guidance PIC/S wrote for its own GMP and GDP inspectors in July 2021. A reply built on a different document forces the inspector to do the translation, and that is where follow-up questions come from.
The four texts in circulation all rest on ALCOA+, and the differences are mostly about who wrote them and for whom. FDA's Questions and Answers (December 2018) is short and tied to US CGMP and Part 11. WHO's guideline, Annex 4 of TRS 1033 (2021), is the reference for prequalification and for regulators working from WHO GMP. The MHRA GxP Data Integrity Guidance and Definitions (March 2018) covers every GxP area and is the usual place to look up the wording of a definition.
Before drafting a response, find out which document the inspector works from, and cite that one first. A US question gets the FDA text, a PIC/S inspectorate gets PI 041-1, a WHO prequalification question gets TRS 1033 Annex 4, and a disputed term gets the MHRA definition.
On the design side, we build SCADA and automation to 21 CFR Part 11 and Annex 11 with ALCOA+ as the baseline.
Topics
Industries



