Skip to content

Life Sciences

Backup and archive are two controls under Annex 11

  • Life Sciences
  • 1 min read

A backup that restores last night's BMS server proves nothing about opening six-year-old pressure records after an upgrade.

EU GMP Annex 11 handles the two in separate clauses, and they need different tests.

Clause 7.2 asks for regular backups of relevant data, with the integrity and accuracy of the backup and the ability to restore it checked during validation and monitored periodically. A restore test answers it: the server comes back, the application starts, last week's data is there.

Archiving sits in clause 17. Archived data has to be checked for accessibility, readability and integrity, and when the system changes, whether new hardware or a new software version, the ability to retrieve the data must be ensured and tested. Retention runs for years, so records are often read on a system that no longer looks like the one that wrote them.

The gap usually opens at an upgrade. The backup job is green every night, and nobody tries to open the old historian files with the new version until an investigation needs them.

One retrieval test worth adding to every upgrade: pick a trend from the oldest retained year, open it in the new version and compare a few values with the exported or printed record.

Our automation engineers design SCADA and BMS to 21 CFR Part 11 and Annex 11, with the URS and validation strategy written alongside the design.

When did your site last retrieve archived trend data after a system change?

Industries

Related

More on this subject

GMP on the electrical side

Where a SCADA, BMS or EMS records GMP-relevant data, access control, clock synchronization, alarm records and audit trails are decided by the electrical and automation engineers. Many sites keep those parameters on a separate validated EMS. Humiley's cross-functional training covers GMP, validation and project management.

InsightRead

When the EMS server fails mid-fill

EU GMP Annex 11 (2011) clause 16 expects documented, tested continuity arrangements for systems supporting critical processes. For an environmental monitoring system that means knowing whether counters buffer and back-fill, who takes manual readings, who decides to stop a fill and how quickly the server can be restored.

InsightRead

ALCOA+ on the EMS is a design requirement

Environmental monitoring and BMS data that support GMP decisions must meet ALCOA+. In practice that means individual logins, time-synchronized controllers, an audit trail users cannot disable, alarms acknowledged with name and comment, and tested backups, with GMP-critical parameters separated early onto a validated system.

Read