Validating the cleaning ten times for the ten products on one line is rarely needed, provided one of them is truly the worst case.
The 2015 text of EU GMP Annex 15 allows the approach with a condition attached: a scientific rationale should be provided for the selection of the worst-case product. The criteria it names may include solubility, cleanability, toxicity and potency.
These criteria rarely point at the same product: the least soluble active need not be the most toxic one. So the rationale ends up as a table, one row per product, with these columns filled in:
- The health-based exposure limit (PDE) from the toxicological evaluation. The lowest one sets the tightest residue limit.
- Solubility of the active in the cleaning medium actually used.
- Cleanability in practice: what operators and past swab results say is hard to remove.
- Strength and batch size, which fix how much active is on the surface to begin with.
When two products split the columns, a common answer is to validate on the one hardest to clean, against the lowest residue limit calculated in the group. APIC's cleaning validation guidance works an example on those lines.
Annex 15 also asks for the impact of new products to be assessed. The table therefore carries a date. A new product on the line reopens it; the old validation is not assumed to cover it.
Topics
Industries




