When the reactivation heater on a desiccant rotor trips, the rotor keeps turning and soon stops drying the air.
The room dew point starts to climb at a rate set by its moisture load, and in a Li-ion dry room near −60 °C dew point the margin to the product limit can be small. What the controls do next belongs in the URS.
The control and alarm set we would ask for:
- A dew-point loop that sets reactivation capacity, by reactivation temperature or rotor speed, from the dew point leaving the rotor, with the setpoint reset from the room dew point.
- Dew-point sensors rated for the range, with their own calibration interval.
- Alarms on reactivation temperature both low and high, loss of reactivation airflow and rotor rotation. Rotation needs its own sensor: a broken drive belt leaves the motor running and the rotor still.
- A defined heater-trip response. Fresh air down to the minimum that holds the room positive, a warning to production, moisture-sensitive material closed up. Where the heater is split into stages, one failed stage should leave part of the capacity.
Then test it. Trip the heater on purpose at OQ and time how long the room takes to reach its product limit. That number becomes the response time in the SOP.
Our desiccant dehumidification reaches −60 °C dew point, and every unit is FAT-tested and witnessed.
Industries




