Dry air at −60 °C dew point carries about one twelfth of the water vapour of air at −40 °C.
Dew point is a logarithmic way of writing how much water is in the air, so the 20-degree step hides the ratio. Published tables give the saturation vapour pressure over ice as about 12.8 Pa at −40 °C and about 1.1 Pa at −60 °C. At atmospheric pressure that is about 127 parts per million by volume against about 11.
Now hold everything else constant. A leaking door seal passes the same grams of water per hour in both rooms, and an operator gives off the same. With an allowance about one twelfth as large, each source weighs about twelve times more in the moisture balance, and the dry air needed to dilute it rises in about that proportion, before the supply air itself has been made any drier.
So the −60 °C room is a different design. Its envelope joints are sealed individually, each penetration is counted, airlocks get their own dry air and the number of people is limited. The dehumidifier changes too: a deeper desiccant process, often with a purge section or a second stage, and more regeneration energy.
Our battery work includes Li-ion dry rooms to −60 °C dew point and below.
A −60 °C specification applied to a room built like a −40 °C one tends to be met on the commissioning day, with nobody inside.
Industries




