The as-built drawings arrive as scanned PDF, and the first modification to the plant needs them in CAD.
Many handovers end this way. The file is complete and signed, and the people who will live with the plant cannot work from it. PDF suits what must not change: signed protocols, test reports, certificates. The drawings and registers that maintenance will edit for twenty years need to stay editable.
So split the handover by use. Everything that will change during the plant's life should come native: the as-built CAD or BIM model, the asset register as a spreadsheet a CMMS can import, the PLC and BMS programs with their source and a backup, the points list, and the control narrative as an editable document.
The record, meaning executed protocols, calibration and material certificates and FAT reports, comes as searchable PDF. Searchable means text rather than a photograph of a page, so a technician can find a tag number by typing it.
Both halves then need one index, by system and by tag. AHU-03 should lead to its drawing, datasheet, FAT report, IQ and spares list, whether the file is a DWG or a PDF.
Write this into the contract, with a sample folder structure, before the first document is produced. Asked for at the end, it turns into a scanning project.
At Humiley the maintenance plan is built from the project's own asset register, so its format matters to us.



