A monthly vibration route with a handheld collector sees each AHU fan bearing for about a minute a month.
That is the trade-off in fan vibration monitoring. Route-based surveys cost little per point: one instrument, one trained technician, a fixed route through the plant rooms. They catch the slow faults well, because imbalance, misalignment and most bearing wear develop over weeks and show up as a rising trend between visits. They miss what happens between visits: a fault that develops in days, a belt that starts slipping at part load, a problem that only appears at start-up.
Permanent online sensors change the coverage. Each bearing is measured continuously, the data goes to the BMS or an IIoT platform, and a step change raises an alert within the hour. The cost is per point rather than per route: sensors, cabling or gateways, and someone to set alert levels that are neither silent nor constant. The severity zones in ISO 20816-3 give a starting point, adjusted to each machine's own baseline.
Most sites need both. Online sensors on the fans whose stop takes a Grade A or B room out of spec with no standby behind them. A monthly route for the rest, with the route data kept in the same trend history.
In Humiley's maintenance work, which fans get sensors follows the criticality assessment.
Industries