A media fill run the week after the AHU filters were changed and the rooms rebalanced tells you how the line performs on its best day.
Annex 1 (2022) expects the aseptic process simulation to imitate routine processing as closely as possible and to include worst-case conditions: the interventions, the duration, the maximum number of people in the room. The HVAC is part of routine processing. Run the APS on an air system in a state it never normally reaches and you have simulated a different process.
For the air, routine covers filters at their normal loading and the pressure cascade at its normal setpoints, with the door openings the maximum crew actually produces. Fan speeds and supply temperatures should be whatever the BMS runs on an ordinary shift, not values a commissioning engineer tuned the day before.
This matters most when an APS fails. If the HVAC was in an unusual state, the investigation cannot tell whether the air system helped or hid the problem.
Two practical steps. Plan maintenance so an APS does not follow a filter change or a rebalance by default. And record the HVAC state for the run the way you record interventions: room pressures, airflows, filter ΔP, any alarms.