Planned coil cleaning on a GMP air handling unit

  • Manufacturing & Distribution
  • 1 min read

A pressure washer held close to a cooling coil folds the fins and drives the dirt deeper into the pack.

Coils in a humid climate foul from the air-entering face inward. Dust that got past the pre-filters lands on wet fins and stays there. Cleaning has to take it back out the way it came, and that sets the method.

Use low-pressure water or low-pressure steam, applied from the leaving face against the direction of airflow, with the fins kept straight. Add a detergent only if it is on the site's approved list, compatible with aluminium fins and copper tubes, and rinsed off completely. Everything washed out ends up in the drain pan, so the drain is checked before cleaning starts.

Frequency is better taken from the coil than from the calendar. Record the air-side pressure drop across the clean coil at a stated airflow during commissioning. Trend it through the BMS or at each inspection, and set the cleaning trigger as a rise above that baseline the site can justify. A coil on a high fresh-air unit in the wet season may reach it much sooner than a fixed interval would assume.

The record should let QA reconstruct the job: date, unit, method, detergent and batch, pressure drop before and after at the same airflow, photos of both faces, and when the unit returned to service with QA release.

Our maintenance service is criticality-based, with condition monitoring and trending.

Talk to an engineer: contact@humiley.com · +84 28 7777 6668 (Viet Nam office)

Industries

Related

More on this subject

Handover formats maintenance can use

Split the handover by use. As-built CAD or BIM, the asset register, PLC and BMS source and the control narrative come in native, editable form. Signed protocols and certificates come as searchable PDF. One index by system and tag joins them, and the formats go into the contract before the first document.

InsightRead

Vibration on AHU fans: route or online sensors

Monthly route-based vibration surveys catch slow fan faults such as imbalance, misalignment and bearing wear at a low cost per point. Permanent online sensors catch faults that develop between visits. Put sensors on fans whose stop takes a Grade A or B room out of spec with no standby, and route the rest.

InsightRead