For each hospital room type, ASHRAE 170 gives nine design inputs in one row of a table.
Most design reviews stop at two of them, pressure and total air changes. In the 2021 edition the inpatient table (Table 7-1) reads, after the room name: pressure relationship to adjacent areas; minimum outdoor ach; minimum total ach; all room air exhausted directly to outdoors; air recirculated by means of room units; unoccupied turndown; minimum filter efficiencies; design relative humidity; design temperature.
Total air changes set the fan and the ducts, while outdoor air sets the coil, and in Viet Nam's wet season most of that coil load is moisture.
A "Yes" under exhausted directly to outdoors means none of that room's air goes back to the air handler: all of it leaves through an exhaust system and the supply has to make it up. Under recirculated by means of room units, a "No" rules out the wall-mounted split unit or fan coil that somebody will propose for that room later, to save a duct.
NR in a cell means no requirement, and a letter in brackets beside a heading points to a note. The notes hold conditions a single cell cannot.
A 2025 edition has been published. Before quoting a cell, check which edition the project's authority or client has adopted.
Industries




