Skip to content

Life Sciences

Night setback in the tropics: keep the dehumidifier on

  • Life Sciences
  • 1 min read

128 of 168 hours: how long a single-shift, five-day Grade C/D suite sits empty each week.

Its AHUs often run as if production never stopped, so setback is the obvious saving. Fan power falls roughly with the cube of fan speed, and a moderate airflow cut gives a much larger power cut, even though real systems save less than the theory.

In Ho Chi Minh City the part that usually goes wrong is humidity. A setback sequence copied from a temperate design often drops the fresh-air coil or the dehumidifier along with the fans. Wet-season outdoor air carries far more moisture than the rooms are designed for, and it keeps getting in through doors, construction joints and the reduced fresh air. By Monday the moisture is in the room fabric and the filters, and the first hours of the week go into drying the suite out.

What should keep running during setback:

  1. Dehumidification, sized for the reduced airflow, with room dew point as the controlled variable.
  2. Supply and extract tracking with a fixed offset per room, so every differential keeps its sign.
  3. Any Grade A/B area served by the same plant stays at full operation unless there is a documented case.

Then time the return to full conditions, humidity included, and make that the restart rule before production.

Industries

Related

More on this subject