At 22 °C and 45% RH, a 1 K rise in room temperature with no change in moisture takes the RH down by about 2.5 points.
Granules, capsules and effervescent blends take up water according to the vapour in the air around them. With a ±2% RH band, less than a degree of temperature swing can take the room from setpoint to the edge of the band while the moisture in the room has not moved, so the two loops cannot be tuned apart.
So the moisture is controlled as moisture. In a tropical plant the drying is staged: a cooling coil takes the bulk out of the wet-season fresh air, a desiccant stage goes lower where the product needs it, and reheat brings the temperature back. The controller acts on dew point or RH, temperature second, and reheat gets a figure in the design-stage energy estimate.
Where the controlling sensor sits changes what the loop sees. A humidity transmitter in a return duct that runs through a warm ceiling void reads air that has already picked up heat, so it reports a lower RH than the room has and the loop under-dries. Put it in the room near product height, or in the return before it leaves the room, and check it against a calibrated handheld at OQ.
Our desiccant dehumidification is built to ±2% RH control.
If your product has an RH limit in its batch record, talk to an engineer: contact@humiley.com or +84 28 7777 6668 (Viet Nam office).
Industries




