IEC 61439 boards: plan the extension at design stage

  • Maintenance Service
  • 1 min read

The MCC that fits the AHUs on handover day is often full by the second extension.

A GMP plant grows in steps: a second filling line, a new warehouse zone, two more AHUs on the roof. Each step needs outgoing ways in a board built for the first design. Under IEC 61439 that is not only a question of space.

An assembly is compliant when its design has been verified, temperature rise and short-circuit withstand included, and each unit has passed routine verification. Add a feeder later and the modified board has to stay inside what that design verification covered, or be verified again. A new starter bolted into an empty section is not automatically covered.

What we would settle at design stage:

  1. Spare ways that are equipped or prepared, in the same design-verified system, with their rating written on the drawing.
  2. Busbar and incomer sized for the extension the owner expects, not only for today's schedule.
  3. Who may modify the board later, and with which documents, so the next contractor knows the verification exists.

Our control panels and MCC/MDB are built to IEC 61439 by qualified partners under Humiley engineering control, and every unit is FAT-tested and witnessed.

Which board on your site runs out of spare ways first?

Related

More on this subject

Proportional balancing of a supply air system

Adjusting each diffuser to its design flow in turn goes round the room without settling, because terminals on a branch share one duct pressure. Proportional balancing sets every terminal to the same ratio of design, with the lowest-ratio terminal left fully open, and only then brings the fan to the design total.