Before the 2 a.m. call: what 24/7 response needs in place

  • Maintenance Service
  • 1 min read

A 24/7 response contract gets tested at 2 a.m., and by then it is too late to go looking for the drawings.

The response time in the contract measures how fast an engineer arrives. What that engineer can do on arrival depends on work done months earlier, and that work is rarely anybody's line item.

Five things we want in place before the first emergency:

  1. A current asset register. Every AHU, chiller, dehumidifier and panel with its tag, location, model and criticality, matching what is actually installed.
  2. Access agreed in advance. Who opens the door for the engineer at night, what gowning they need, and who can authorise work in a classified area.
  3. Critical spares on site or within reach. The belts, sensors, contactors and filters whose absence turns a short repair into a long wait.
  4. A named contact on the client side with authority to decide, and a backup for holidays.
  5. As-built drawings, O&M manuals and the last maintenance records, somewhere the attending engineer can open them.

The call-out fee pays for none of this. All of it decides whether the call-out fixes anything.

Our maintenance contracts start from the project's own asset register and criticality assessment, so most of this list is built during handover rather than rediscovered in the middle of a fault.