Skip to content

Careers

PADR: how we measure engineer development

  • Careers
  • 1 min read

Twice a year, every engineer at Humiley sits down for a PADR: a Performance Appraisal Development Review.

The reason is practical. In a young engineering team, growth is the product. A graduate who joins us will one day sign off a pressure cascade or witness a FAT for a client whose inspection depends on it. We can't assume they got there. We have to be able to show it.

So the review isn't a general conversation about attitude. It sits on top of each engineer's skills matrix and Individual Improvement Plan: which competencies moved since the last review, what work shows it, what goes into the next six months, and who on the team will help.

That structure matters to clients as well. When we say a senior engineer is leading your HVAC design, the progression from junior to senior to lead has a record behind it, the same way a validated system does.

If that is how you want to learn the trade, our careers page is the place to start.

Careers at Humiley

Related

More on this subject

Cleanroom HVAC design means load calculations where moisture often outweighs heat, pressure cascades typically 10–15 Pa between grades, coils sized for wet-season dew points, BIM coordination and a paper trail for every airflow. Humiley trains graduates through a skills matrix and a 12-month internship program.

InsightRead

Why we grow our own cleanroom engineers

More than 20 interns joined Humiley's 12-month structured internship in its first year. Training designed with lead engineers from the USA covers fundamentals, on-the-job mentoring, GMP, validation and project management, with a skills matrix and improvement plan for every engineer from junior to lead.

Read