Skip to content

Careers

What makes an engineer senior at Humiley

  • Careers
  • 1 min read

Every engineer at Humiley has a skills matrix with a level against each competency, and an Individual Improvement Plan beside it.

The matrix lists the competencies the role needs and the level the engineer has demonstrated in each. The plan says which gaps close next, how, and with whose help. The path from junior to senior to lead is read against that evidence.

For a cleanroom HVAC engineer, the rows that matter include things like:

  1. Heat and moisture load calculation, including the tropical dehumidification case.
  2. Pressure cascade and airflow design from room data sheets.
  3. AHU specification to EN 1886 and filter selection to EN 1822 and ISO 16890.
  4. Witnessing a FAT and writing up what was found.
  5. Drafting IQ and OQ protocols and supporting qualification tests on site.

Progress is reviewed twice a year in PADR, our performance appraisal and development review, and supported by cross-functional training in GMP, validation and project management.

Industries

Related

More on this subject

Inside the role: cleanroom HVAC design engineer

Cleanroom HVAC design means load calculations where moisture often outweighs heat, pressure cascades typically 10–15 Pa between grades, coils sized for wet-season dew points, BIM coordination and a paper trail for every airflow. Humiley trains graduates through a skills matrix and a 12-month internship program.

InsightRead

Every Humiley engineer has a Performance Appraisal Development Review twice a year, built on their skills matrix and Individual Improvement Plan. It records which competencies moved, the work that shows it and the plan for the next six months, so progression from junior to senior to lead has evidence behind it.

InsightRead