Our engineers have their PADR, the Performance Appraisal Development Review, every six months rather than once a year.
People ask why. The honest answer is memory.
A yearly review looks back over twelve months. By then the design package is issued, the site has moved on, and nobody remembers the detail: the clash the engineer caught in the ceiling void, or the load calculation that had to be redone because a room data sheet was read wrong. The review turns into general impressions, which are the least useful kind of feedback for someone learning a technical trade.
Six months is short enough that the work is still recognisable, and often still running. So the Individual Improvement Plan written at one review can point at something real: take the pressure cascade calculation on the next package, sit in on the FAT for the air handling units, write the first draft of an IQ protocol. At the next review the lead engineer can check that against work they saw.
It sits alongside a skills matrix, with a defined path from junior to senior to lead, and cross-functional training in GMP, validation and project management. We train fresh graduates into proficient engineers, and the frequent reviews are part of how that works. We also run a 12-month internship program.
If you are thinking about a move into life-sciences engineering, our open roles are on the careers page.
Topics




