A new cleanroom HVAC design engineer spends the first months learning why a room needs its air, before sizing a single duct.
If you are finishing a mechanical or thermal engineering degree in Viet Nam and weighing specialisms, this is what the work involves:
- Load calculations. Heat from equipment, people, lighting and process, plus the moisture load, which in our climate is often the bigger number. You learn to question every input.
- Pressure cascades. Setting the differential between rooms, typically 10–15 Pa between adjacent grades, then working out the leakage and supply air that hold it.
- Coil sizing for the wet season. Temperate methods fail on wet afternoons, not hot ones, so the fresh-air coil is sized on peak dew point.
- BIM coordination. Ducts, pipes, cable trays and structure compete for the same ceiling void. A clash is found on screen or on site, and on site costs more.
- The paper trail. Every airflow number ends up in a URS, a test protocol or a room data sheet that someone will check.
At Humiley, every engineer has a skills matrix and an Individual Improvement Plan, with a defined path from junior to senior to lead, and training designed with lead engineers from the USA. Our 12-month internship program onboarded 20+ interns in its first year.
Openings are posted on our careers page.