On a design review I pick one number on the drawing and ask the junior engineer where it came from.
Say it is a supply airflow of 2,400 m³/h on the AHU schedule for a Grade C room. The answer I hope for walks back one step at a time. The room data sheet gives 40 m² and a 3.0 m ceiling, so 120 m³. The airflow is 20 air changes an hour on that volume. The 20 comes from the project's design basis for Grade C rooms, and the design basis cites the recovery time in the URS, which the qualification will test. That is four documents, and a good answer opens each one at the right line.
The answer that worries me is "it was on the last project". Sometimes that number is right. But if nobody can say why, nobody notices when the ceiling rises at detail design or the URS asks for a faster recovery, and the schedule keeps a figure that no longer follows from anything.
I would rather hear "I don't know yet, I'll find out" than a confident guess. In the meeting a guess sounds the same as a checked figure, and I cannot tell them apart until someone opens the design basis.
Our engineers learn this on projects, working next to senior leads. Each of them also has a skills matrix and an Individual Improvement Plan, with a path from junior to senior to lead.
Industries