Move a floor drain by one metre on a pharma project and three of the roles we are hiring for all have work to do.

Follow one design change on a pharmaceutical project and you can see where three of the roles we recruit for meet. Suppose the process team moves a floor drain in a wash room by a metre.

The civil and structural engineer now has a new slab penetration to check against the reinforcement, and a floor fall that has to reach the new drain position instead of the old one. That change reaches the quantity surveyor as a revision to the bill of quantities, and the variation gets priced, because the cost data behind the monthly earned value report has to follow the design. Meanwhile the revised drawing goes out under transmittal from the project administrator, the superseded sheet is withdrawn from site, and the as-built later lands in the turnover package that qualification starts from.

If the transmittal step is missed, the drain can be cast where the old drawing showed it and broken out again after the floor finish is down.

We are looking for civil/structural engineers, quantity surveyors and project administrators in Ho Chi Minh City. Our cross-functional training covers GMP, validation and project management, with senior leads mentoring on the job.

Careers at Humiley

Industries

Related

More on this subject

A commissioning engineer walks each system against the drawings, starts and balances it room by room, sets the pressure cascade and closes the punch list before qualification. It is hands-on, document-heavy and the fastest way to learn how HVAC, controls and validation connect. Our 12-month internship is one way in.

InsightRead

At Humiley Group INC., we believe that the foundation of every successful project—whether in the pharmaceutical, semiconductor, or renewable energy sectors—is built upon the people who design, manage, and execute it. Today, we are proud to announce the expansion of our team as we welcome a new group of talented professionals to the Humiley family.

Read