Solvent vapour, process dust, potent-compound exhaust and fume-hood air each need their own duct, fan and treatment, for different reasons.
Joined up, they look like one fan and one stack instead of four. What each brings to a shared duct:
- Solvent exhaust can carry a flammable atmosphere. Its fan, motor and dampers are selected for that hazardous zone, and anything connected to the duct inherits the classification. Abatement also works better on a concentrated stream.
- Dust from granulation, milling or compression needs a transport velocity that keeps it from settling, and a dust collector at the end. Mix in humid air and it cakes on the walls; for some powders, settled dust is an explosion question.
- Potent-compound exhaust is HEPA-filtered close to the source, in bag-in/bag-out housings, with the duct held negative. Any stream joined upstream of that filter spreads contaminated ductwork through the building.
- Fume-hood exhaust sets each hood's face velocity. On a shared duct, another system's damper moves the hood's airflow, and acid and solvent vapours can react or condense together.
Draw each stream on the schematic with its hazard, treatment and fan before plant room space is allocated. We treat the CCS as the organizing document on Life Sciences projects, and the exhaust schematic reads as part of it.