Cartons and labels stored at 80% RH carry that moisture into a 20% RH packing room, and release it over the following hours.
Paper and board are hygroscopic. The water they hold follows the humidity around them, so board from a humid warehouse arrives holding far more than it will settle at in dry air, and gives the difference up to the room.
A worked example shows the scale. If the board releases only 2% of its weight, a 500 kg delivery of shipper cartons, leaflets and label rolls puts 10 kg of water into the room air.
The dehumidifier sees a latent load it was never sized for. Near the packing line, local RH can sit above the room sensor's reading, right beside a hygroscopic product in open blisters. Labels curl, adhesives behave differently, and cartons drift out of size on the cartoner.
The fix is a staging step before the room:
- A controlled store or anteroom at, or close to, the packing room condition, where packaging waits a defined time before use.
- That time set by test: weigh sample cartons on arrival and during staging until the weight stops falling.
- Stretch wrap removed in staging, since wrapped board barely conditions. First in, first out, with the entry time written on the pallet.
Moisture carried in on materials belongs in the room's moisture budget, and we size dehumidification from the room's own load, to ±2% RH control.
Where does your packaging wait before it goes into the dry room?




